top of page

GLEN INNES TO TAMAKI DRIVE SHARED PATH

  • Project completed for Oxcon.CLL

  • The Glen Innes to Tāmaki Drive Shared Path - Te Ara Ki Uta Ki Tai (the path of land and sea) is a 7km long path that connects Auckland’s eastern suburbs to the city centre

  • The project consisted of 300 meters of bridges (2 bridges) with one bridge spalling the Eastern Line of the rail network

  • There was 800 meters of timber boardwalks and almost 2km’s of 4 meter wide concrete paths.

  • Oxcon.CLL delivered Section 2 of this joint project from St Johns Road through to the Orakei Basin

  • Almond Contractors were contracted in to construct and install stormwater outlet structures, carry out the deep excavations with shoring and lay 60m of 375mm concrete pipe

bottom of page